Solar Nest 1 - 11 MW SOLAR POWER PLANT
SOLAR PROJECT SITE | PUDHUKOTTAI |
---|---|
LAND LOCATION | Pudhukottai Dt |
CAPACITY PROPOSED | 11 MWpAC |
CAPACITY AT DC SIDE | 11 MWp/ 16MWp |
DISTANCE FROM SUBSTATION | 3 KM |
NEAREST TOWN | Pudhukottai |
NEAREST RAILWAY STATION | Keeranur Rail Way Station |
NEAREST CITY | Tiruchirappalli (40 KM nearby) |
NEAREST AIRPORT | Tiruchirappalli International Airport |
SOIL TYPE | Red Soil |
Green Sparrow Solar Nest (P) Ltd. is at the forefront of solar energy development in Pudhukottai district, Tamil Nadu, with a project site in Udayalipatti and Odugampatti villages. The company is currently acquiring nearly 40 acres of barren land for the construction of a 11 MW solar project, happening in Two phases.
The solar power plant will connect to the Kundrandarkoil 33/11 KV Substation, located just 3 km away. TANGEDCO has conducted a load flow study for 11 MW and granted permission for Green Sparrow Solar Nest to develop the solar power plant and integrate it into the grid.
A 3 km transmission line has been established on overhead poles, with over 30 poles connecting the solar power plant to the substation. Green Sparrow Solar Nest Pvt Ltd has procured the Right of Way for the transmission lines, ensuring a smooth and seamless process for our clients. The company is well equipped to obtain all necessary licenses and permissions to guarantee compliance with regulations and industry standards.
Green Sparrow Solar Nest (P) Ltd. has completed Phase 1, purchasing 22.30 acres for a 6 MW solar project, with 5 MW already sold to various customers and 1 MW available for sale.
In Phase 2, the company is procuring 19 acres to build a 5 MW project, wherein 2 MW is sold to a client, and 3 MW remains open for purchase. Secure your sustainable energy solution with Green Sparrow Solar Nest's available solar capacities.